RajaMahendraVaram

RAJAMAHENDRAVARAM GREENFIELD HIGHWAY PRIVATE LIMITED (RGHPL)

Construction of 4 lane Access Controlled New Greenfield Highway section of NH-365BG (Khammam-Devarapalle) of length 29.462 km from Gurvaygudem village to Devarapalle village (Design Chainage 132+664 to 162+126), within Inter Corridor Route, under Bharatmala Pariyojana, on Hybrid Annuity mode in the state of Andhra Pradesh.

 

The Project Highway is a new alignment and does not pass through any existing alignment. The proposed highway shall be access-controlled flexible payment for design traffic of 75 MSA and comprises of the following grade separators along with adequate water drainage structures.

Key Aspects for the Project

Project Contract Aspects

S. No

Description

Key Aspects

1

Contract Type

PPP on Hybrid Annuity Mode

2

Bid Date ( Date of Inception)

7Th January 2021

3

Date of LOA

15th September 2021

4

Authority

National Highway Authority of India

5

Road Configuration

4 Lane Highway

6

National Highway no.

NH365 BG (New)

7

National Highway Route

Khammam – Devarapalli,

The total length of 162.126 Kms

8

Project Package

Package 5 of 5 ( Andhra Pradesh)

9

Length of the Road project

29.462 Km.

10

Nature of project

Access controlled Greenfield Highway

11

Construction Period

730 days (2 years)

12

Operation and Maintenance Period

15 years

13

Total Concession period

17 years

Location of the Project Corridor

The Project site is part of the new National Highway NH365 BG from Khammam to Devarapalli, a greenfield 4 lane highway passing through new alignment in a plane and rolling terrain. 

 

The project road starts at the crossroad junction of Sathupalli – Eluru State highway SH43 near Recharla village and ends at the crossroad junction of Jangareddigudem – Eluru State highway SH-44 near Guravygudem village. The total length of the project road is 27.428 km.

 

The project passes through cropland (agriculture/horticulture) from Km.105.236 to Km 132.664.

Operation & Maintenance

A separate Operation and Maintenance contractor shall be engaged during the Operation period. 

The Operation and Maintenance period for the project is 15 years and the key deliverables during the period shall be:

 

  1. Preventive maintenance for roads and major structures
  2. Traffic management system
  3. Accident response with dedicated teams 
  4. Repair of damaged works 
  5. Project facilities management including plantations and amenities.

 

*Toll plaza operation shall be by the Authority 

 AuthorityNational Highways Authority of India
Sponsor

M/s. BEKEM Infra Projects Private Limited,

# Plot No. 289, Avenue-1, Road No. 06,

Kakatiya Hills, Madhapur, Hyderabad – 500 081

 

M/s. Sri Avantika Contractors (I) Ltd

# D No. 8-2-603/23/3&15, 3rd floor, HSR Summit,

Besides No.1 news channel, Road No. 10, Banjara Hills, Hyderabad-500034

 

Project Company

RAJAMAHENDRAVARAM GREENFIELD HIGHWAY PRIVATE LIMITED (RGHPL)

# 4th Floor, P.No.289, Avenue-1, Road No. 06,

Kakathiya Hills, Guttala Begumpet, Hyderabad – 500 081.